Skip to content
FUSE BOX FITTERS Greater Manchester 0161 710 4124 Get my fixed price
Call now WhatsApp Get my price
Real boards, real houses

Boards we have fitted

Every board on this page is one we fitted, photographed on the day we finished it. Nothing here is a stock photo. If your board looks like the one in the first picture, you already know what the after looks like.

Free and no obligation. Or call 0161 710 4124, a person answers. Greater Manchester postcodes only.

  • 5.0 from 18 Google reviews
  • 12-month guarantee
  • NAPIT 75762, insured, Part P notified
  • Fitted and certified in one day
Two consumer units fitted side by side with every conductor dressed to the bars Fitted by us
Photographed on the dayEvery board here is ours
Electricians replying now

Three photos. One fixed price.

Reply within two working hours, 8am to 8pm, seven days. No home visit and no sales call. A qualified electrician looks at your actual board and sends a written price back.

£449Fixed from, in writing
2 hrsPrice back, 8am to 8pm
1 dayFitted and certified
12 mthsWorkmanship guarantee
Rather not fill in a form?WhatsApp the same three photos. Same electrician, same two-hour reply. WhatsApp the photos

Our WhatsApp is run by SB Electrical Group, the team behind Fuse Box Fitters. Greater Manchester postcodes only.

07703 295654 · opens WhatsApp with a message ready

Greater Manchester only: M, SK, OL, BL, WN, WA3 and WA13 to WA16 postcodes.

Photos optional

Photos are optional. Your details are only used to send your quote and never passed on. 14-day cancellation rights apply. See our privacy policy.

Straight swap

From fuse wire to a modern consumer unit

This house was still on rewireable fuses, where a blown circuit means threading a new length of fuse wire by hand. There was no RCD on the board, so nothing to cut the power fast if someone touched a live fault. The old box came out and a new consumer unit with RCD protection went in. The label on the front is the six-monthly RCD test reminder, the bit people forget exists.

0RCDs on the old box
RCDprotection on the new board
1visit, certificate included
Thirteen RCBOs

Every circuit on its own RCBO, every way labelled

Thirteen RCBOs and a 100A main switch, with a surge protector on the end and two spare ways left for later. When something trips, one circuit goes off instead of half the house, and you can see which one without a torch. Every label is written by hand before we leave, because a board nobody can read is a board nobody can safely work on.

13RCBOs, one per circuit
100Amain switch
2spare ways
Twin boards

Two boards, one property, nothing shared

Some houses have more circuits than one board can take. Rather than cram them in, this one got a pair of boards with a proper split, an RCBO on every way in both. Conductors run to length and combed into the bars means the next electrician can trace a circuit in seconds, and terminals stay tight because nothing is under strain.

2boards, properly split
Everyway on an RCBO
0shared neutrals
More from the van

The cellar job, start to finish

We are not putting a price against each board, because the number depends on your circuits and your earthing rather than on somebody else’s house. The cost page shows how a price is built, or send three photos and get your own figure in two working hours.

Registered and assessed

NAPIT registered. Member number 75762.

NAPIT is one of the UK's government-approved registration schemes for electricians. To get on the register, a firm's work, qualifications and insurance are checked by NAPIT's own assessors, and it has to keep passing those checks to stay on it.

  • Work checked on siteNAPIT assessors inspect our finished boards against BS 7671, the wiring regulations.
  • Qualified and insuredWe proved our qualifications and insurance to join, and keep them current to stay registered.
  • Building Regulations certificateEvery board we fit is notified through NAPIT, and you get the compliance certificate.
  • Check it yourselfOur registration is public. Search member number 75762 and it takes seconds.
Check us on the NAPIT register

On the NAPIT site, choose Member Number and enter 75762. The registration is held by SB Electrical Group Ltd, the company behind Fuse Box Fitters, so that is the name you will see.

Free guides

Read before you book

All guides →
Fixed price in two hours

Your board could be the next after photo

Three photos, two working hours, one fixed price.

Our WhatsApp is run by SB Electrical Group, the team behind Fuse Box Fitters. Greater Manchester postcodes only.

Or call 0161 710 4124. A person answers, not a menu.