Skip to content
FUSE BOX FITTERS Greater Manchester 0161 710 4124 Get my fixed price
Call now WhatsApp Get my price
RCBO boards, fitted in a day

Consumer unit replacement in Manchester

We fit modern metal consumer units with an RCBO on every circuit and surge protection built in, from £449 fixed. One visit, every circuit tested, Electrical Installation Certificate and Part P notification included.

Free and no obligation. Or call 0161 710 4124, a person answers. Greater Manchester postcodes only.

  • 5.0 from 18 Google reviews
  • 12-month guarantee
  • NAPIT 75762, insured, Part P notified
  • Fitted and certified in one day
A finished consumer unit with every way labelled with a picture and a name Fitted by us
From £449 fixedRCBO on every circuit, SPD included
Electricians replying now

Three photos. One fixed price.

Reply within two working hours, 8am to 8pm, seven days. No home visit and no sales call. A qualified electrician looks at your actual board and sends a written price back.

£449Fixed from, in writing
2 hrsPrice back, 8am to 8pm
1 dayFitted and certified
12 mthsWorkmanship guarantee
Rather not fill in a form?WhatsApp the same three photos. Same electrician, same two-hour reply. WhatsApp the photos

Our WhatsApp is run by SB Electrical Group, the team behind Fuse Box Fitters. Greater Manchester postcodes only.

07703 295654 · opens WhatsApp with a message ready

Greater Manchester only: M, SK, OL, BL, WN, WA3 and WA13 to WA16 postcodes.

Photos optional

Photos are optional. Your details are only used to send your quote and never passed on. 14-day cancellation rights apply. See our privacy policy.

Is a consumer unit the same as a fuse board? Yes.

Consumer unit is the technical name. Fuse board and fuse box are the everyday names. It is the grey or white box everything electrical in your house runs through. If yours has switches, it is a consumer unit. If it has wire fuses, the old fuse box page is written for you.

18th Edition boards

What a new consumer unit actually gets you

This is not a like-for-like swap. BS 7671 changed what a good board looks like, and the difference is worth understanding before you compare quotes.

An RCBO on every circuit Older boards share one RCD across half the house, so one faulty kettle trips the lot. An RCBO protects each circuit on its own. A fault in the kitchen stays in the kitchen.
Surge protection built in A surge protection device absorbs voltage spikes before they reach your boiler, TV or chargers. BS 7671 now expects one in most homes and we fit it as standard.
A metal, non-combustible enclosure Since 2016 consumer units in homes must be metal or otherwise non-combustible, so a fault inside cannot become a fire outside. Plastic boards are the most common EICR observation we see.
Room to grow We fit boards with spare ways, so an EV charger, electric shower or garden supply later is a small job, not another new board.
An old rewireable fuse box with the cover offBefore
The new consumer unit that replaced the rewireable fuse boxAfter
Signs it is time

When a consumer unit should be replaced

  • It is plastic, has no Test button anywhere, or trips the whole house when one thing goes wrong. None of those mean danger today, but an EICR will usually code them.
  • Your EICR has come back unsatisfactory with the board coded C2. Replacement is normally the fix the report is pointing at.
  • You are about to add a big load like a 10.5kW shower or a 7kW car charger. Most installers will not connect to an old board, so the board comes first.
What it costs

Most homes land between £449 and £750

The number of circuits sets the base price. Earthing, bonding or meter tail upgrades are the usual extras, and we price them from your photos, not on the day.

See every price →
£449Up to 6 circuits
£549Up to 10 circuits
£69511 or more
Questions

Consumer unit questions

Anything else, call or WhatsApp. A real electrician answers, 8am to 8pm, seven days.

Our WhatsApp is run by SB Electrical Group, the team behind Fuse Box Fitters. Greater Manchester postcodes only.

Yes. Consumer unit is the technical name, fuse board and fuse box are the everyday names. If yours has wire fuses it is an old fuse box; if it has switches it is a consumer unit.

Registered and assessed

NAPIT registered. Member number 75762.

NAPIT is one of the UK's government-approved registration schemes for electricians. To get on the register, a firm's work, qualifications and insurance are checked by NAPIT's own assessors, and it has to keep passing those checks to stay on it.

  • Work checked on siteNAPIT assessors inspect our finished boards against BS 7671, the wiring regulations.
  • Qualified and insuredWe proved our qualifications and insurance to join, and keep them current to stay registered.
  • Building Regulations certificateEvery board we fit is notified through NAPIT, and you get the compliance certificate.
  • Check it yourselfOur registration is public. Search member number 75762 and it takes seconds.
Check us on the NAPIT register

On the NAPIT site, choose Member Number and enter 75762. The registration is held by SB Electrical Group Ltd, the company behind Fuse Box Fitters, so that is the name you will see.

Free guides

Read before you book

All guides →
Fixed price in two hours

Ready when you are

Three photos gets you a fixed written price within two working hours. Or just ring us and describe what you have.

Our WhatsApp is run by SB Electrical Group, the team behind Fuse Box Fitters. Greater Manchester postcodes only.

Or call 0161 710 4124. A person answers, not a menu.