Do I need a new fuse board to fit an EV charger?
Often, yes. A 7kW home charger needs its own dedicated circuit, the right type of RCD protection, and a spare way on the board. Old boards usually offer none of the three. That is why charger installers look at your board photo before they will book you in.
The same logic applies to electric showers. A 10.5kW shower pulls more than 40 amps continuously, more than an entire 1970s house was designed around.
What an EV-ready board gives you
Same fixed packages as every other job. We fit the board; your charger installer fits the charger, or we can recommend one we work with.
Board prices are the same fixed packages as every other job. See the cost page →
High load questions
Anything else, call or WhatsApp. A real electrician answers, 8am to 8pm, seven days.
Our WhatsApp is run by SB Electrical Group, the team behind Fuse Box Fitters. Greater Manchester postcodes only.
Often, yes. A 7kW charger needs a dedicated circuit with the right RCD type and a spare way on the board. Old boards usually have neither, which is why many charger installers will quote for the charger only once the board is sorted.
A modern 9.5kW to 10.5kW shower draws more than 40 amps on its own. It needs its own circuit, properly protected. If your board is an old rewireable box or has no spare ways, the board comes first.
Do the board first or together. Doing it first means any installer can then fit the charger without surprises, and the power is only off once.
A metal consumer unit with RCBOs, surge protection and at least two spare ways sized for high load circuits, so a charger or shower can be added later as a small job.
NAPIT registered. Member number 75762.
NAPIT is one of the UK's government-approved registration schemes for electricians. To get on the register, a firm's work, qualifications and insurance are checked by NAPIT's own assessors, and it has to keep passing those checks to stay on it.
- Work checked on siteNAPIT assessors inspect our finished boards against BS 7671, the wiring regulations.
- Qualified and insuredWe proved our qualifications and insurance to join, and keep them current to stay registered.
- Building Regulations certificateEvery board we fit is notified through NAPIT, and you get the compliance certificate.
- Check it yourselfOur registration is public. Search member number 75762 and it takes seconds.
On the NAPIT site, choose Member Number and enter 75762. The registration is held by SB Electrical Group Ltd, the company behind Fuse Box Fitters, so that is the name you will see.
Read before you book

The current each one draws, and the four things that decide if your board copes.
5 min readRead the guide →
What the SPD on a modern board does, and why it is now expected.
4 min readRead the guide →
Why one fault can switch off half the house, and how an RCBO board stops it.
5 min readRead the guide →