Replacing a consumer unit is notifiable work under Part P of the Building Regulations in England. The simplest way to comply is to use an electrician registered with a competent person scheme such as NAPIT, who self-certifies the work and notifies Building Control. You get an Electrical Installation Certificate on the day and a Building Regulations compliance certificate afterwards.
What Part P covers
Part P is the part of the Building Regulations in England that deals with electrical safety in homes. Most electrical work has to meet it, and some work is also notifiable, meaning Building Control must be told. Notifiable work includes installing a new circuit, work in some parts of a bathroom, and replacing a consumer unit.
Two ways to comply
- A registered electrician. Electricians registered with a competent person scheme, such as NAPIT, can self-certify their work. They notify Building Control for you, and there is no separate application or inspection fee.
- Building Control directly. If the electrician is not registered, you apply to the council's Building Control before the work starts, pay their fee, and they inspect it. Slower and usually dearer.
The two certificates you should get
- Electrical Installation Certificate (EIC). From the electrician, on the day. It records what was installed and the test results for every circuit.
- Building Regulations compliance certificate. From the registration scheme, a few weeks later, confirming the work has been notified.
Keep both with the house documents. A buyer's solicitor will ask for them.
After
AfterHow to check an electrician is registered
Every registered electrician has a membership number you can look up. Ours is NAPIT member 75762, registered to SB Electrical Group Ltd, and you can check it on the NAPIT register. If someone offers to change your board "without the paperwork", walk away.
If work was done without notification
It happens, and it is fixable. The council can sometimes regularise unnotified work after the event. An EICR from a registered electrician will at least show the current condition, which is often what a buyer's solicitor needs to proceed.


